Sports & Entertainment Case Studies
Staples Center
AEG Facilities has set aggressive missions regarding energy efficiency and sustainability. AtmosAir and independent laboratory EMSL tested the air quality in Staples Center’s Lexus Club, a private dining room located inside the Staples Center. AEG/Staples Center engineering wanted a baseline measurement of contaminant levels with the air handling and filter systems operating as installed, and later with AtmosAir bi-polar ionization systems working in the same airspace, using reduced outside air.
ACTION PLAN
AtmosAir and independent laboratory EMSL tested the air quality in Staples Center’s Lexus Club, a private dining room located inside the Staples Center. AEG/Staples Center engineering wanted a baseline measurement of contaminant levels with the air handling and filter systems operating as installed, and later with AtmosAir bi-polar ionization systems working in the same air space, using reduced outside air.
After a successful test in the Lexus Club, the Staples Center engineering team wanted to determine if AtmosAir systems generated an electrical energy savings when installed in a large arena.
After a successful test in the Lexus Club, the Staples Center engineering team wanted to determine if AtmosAir systems generated an electrical energy savings when installed in a large arena.
TESTING
The AEG Facilities engineering team ran a fluke power monitor connected to air handler #6 in a “before and after” test. Weather conditions were identical.
The “before” test was a 48-hour test with AtmosAir air purification systems installed and operating. AEG locked the outside dampers and left only pre-filters installed.
The “after” test was a 48-hour test beginning immediately after the AtmosAir air purification “before” test. Bag and pre-filters were installed and the outside air dampers were returned to normal, automatic operation.
The “before” test was a 48-hour test with AtmosAir air purification systems installed and operating. AEG locked the outside dampers and left only pre-filters installed.
The “after” test was a 48-hour test beginning immediately after the AtmosAir air purification “before” test. Bag and pre-filters were installed and the outside air dampers were returned to normal, automatic operation.
RESULTS
Air quality, especially gaseous elements, VOCs and TVOC, improved significantly from baseline measurements to measurements taken with AtmosAir systems installed and outside air reduced.
• Energy Savings: 21%
• PM10 Reduction: 25%
• VOCs Reduction: 90%
• Test results for AHU-6 equated to a savings of roughly 127 kWh or about $16.51 every 48 hours.
AtmosAir is currently installed in the entire arena.
Third party testing performed by EMSL Laboratories.
• Energy Savings: 21%
• PM10 Reduction: 25%
• VOCs Reduction: 90%
• Test results for AHU-6 equated to a savings of roughly 127 kWh or about $16.51 every 48 hours.
AtmosAir is currently installed in the entire arena.
Third party testing performed by EMSL Laboratories.
Pittsburgh Pirates Locker Room
PNC Park
ACTION PLAN
AtmosAir was installed in PNC Park in the Pittsburgh Pirates locker room.
Before and after air testing was done.
Before and after air testing was done.
RESULTS
After only 24 hours of the systems running, the Pittsburgh Pirates locker room observed:
• 62% reduction in TVOCs
• 68% reduction in PM10
• VOCs Reduction: 90%
• 58% reduction in PM5
• 50% reduction in PM2.5
• 62% reduction in TVOCs
• 68% reduction in PM10
• VOCs Reduction: 90%
• 58% reduction in PM5
• 50% reduction in PM2.5